Customization: | Available |
---|---|
After-sales Service: | One Year Remote Warranty |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 7500/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Dongguan Chencheng Machinery Equipment Co,Ltd.mainly produces soft rubber extruder production lines. Squeeze out the main raw materials used in the machine production line are TPE(TRP) particles,TPE raw materials (oil and powder mixture),and PVC(PVC powder and oil).Our factory is an enterprise integrating R&D, production and sales. Over the years,the company has taken "professionalism, integrity, peace and sustainability"as its business philosophy, which has been affirmed by the market and widely recognized by customers. Welcome new and old friends to come to discuss cooperation!
No | Tpe | Output | Power | Weight |
1 | CC55 | 60kg/h | 15kw | 550kg |
2 | CC65 | 70kg/h | 20kw | 650kg |
3 | CC75 | 90kg/h | 23kw | 750kg |
4 | CC80 | 100kg/h | 25kw | 800kg |
5 | CC90 | 120kg/h | 30kw | 1000kg |
6 | CC110 | 150kg/h | 35kw | 1200kg |
7 | CC120 | 160kg/h | 40kw | 1500kg |
8 | CC130 | 180kg/h | 45kw | 1800kg |
The main raw materials used in this machine are TPE (TRP) granules, TPE raw materials (oil plus powder mix), PVC (PVC powder additive). It can be used with various molds to produce various PVC, PE, PP and other plastic hoses and sealing strips. It can also be used to produce various silicone products, such as adult products, plastic toys, etc.
Packing: Packing by wooden cases.
Payment: Always 30% down payment as deposit,70% balance pay before shipping.
Delivery time: 30 working days from the date of receipt of down payment.
Warranty: 1 year from the date of the bill of lading.
Installation: For novice buyers with zero knowledge, we will provide online instruction to ensure you can operate the machine until you are proficient.
Q1: How long is the delivery time?
A1: Generally it will take 15-30 days.
Q2: Where is your factory ?
A2:Our factory is in Dongguan City, Guangdong Province, welcome to visit!
Q3:If we buy your machine, what is your guarantee or guarantee of quality?
A3:We provide you with high quality machines with 1 year warranty
Q4:Your company is a trading company or a direct factory?
A4:We are a factory located in Dongguan City, Guangdong Province. It is very close to Guangzhou and Shenzhen.
Q5:Do you provide technical support?
A5:It is our original intention to help each customer to solve their problems, we will have very detailed instructions for use, customers do not understand directly consult customer service, our customer service will be dedicated to answer all customer questions.